Coverart for item
The Resource Applied cost engineering, Forrest Clark, A.B. Lorenzoni

Applied cost engineering, Forrest Clark, A.B. Lorenzoni

Label
Applied cost engineering
Title
Applied cost engineering
Statement of responsibility
Forrest Clark, A.B. Lorenzoni
Creator
Contributor
Subject
Language
eng
Summary
This thoroughly rewritten and updated third edition offers comprehensive coverage of cost engineering, emphasizing capital projects and focusing on both estimating and cost control. Maintaining and enhancing the style of presentation that made the previous editions so popular, Applied Cost Engineering, Third Edition furnishes an entirely new and co
http://library.link/vocab/creatorDate
1923-
http://library.link/vocab/creatorName
Clark, Forrest D.
Dewey number
658.15/52
Index
no index present
Literary form
non fiction
Nature of contents
dictionaries
http://library.link/vocab/relatedWorkOrContributorDate
1928-
http://library.link/vocab/relatedWorkOrContributorName
Lorenzoni, A. B.
http://library.link/vocab/subjectName
  • Engineering economy
  • Cost control
  • Engineering
Label
Applied cost engineering, Forrest Clark, A.B. Lorenzoni
Instantiates
Publication
Note
"First published 1996."
Antecedent source
unknown
Color
multicolored
Contents
Part 1 Cost estimating: estimate accuracy, estimation approaches/classes, estimating methods, computerized estimating, labour productivity, indirect costs, data collection and management, estimate coding and documentation, predicting future escalation, contingency a provision for uncertainties, estimating a revamp project. Part 2 Cost control: introduction to cost control, the cost engineer as part of project management, cost control during conceptual engineering, cost control during detailed engineering - introduction to the problem, cost control during engineering - engineering costs, cost control during detailed engineering - equipment purchases, cost control during detailed engineering - bulk materials, project changes, subcontract development, administration and control, cost control during construction - the first three steps, cost control during construction - forecasting direct field labour, cost control during construction - items other than direct field labour, the monthly cost report and cost control meetings, systems and computer applications, the cost of cost control, selecting a contractor for a reimbursable-type contract, control of bulk materials. Part 3 Case studies
Control code
on1103441058
Dimensions
unknown
Edition
Third edition
Extent
1 online resource (440 pages)
File format
unknown
Form of item
online
Isbn
9781439892886
Level of compression
unknown
Note
Taylor & Francis
Quality assurance targets
not applicable
Reformatting quality
unknown
Sound
unknown sound
Specific material designation
remote
System control number
(OCoLC)1103441058
Label
Applied cost engineering, Forrest Clark, A.B. Lorenzoni
Publication
Note
"First published 1996."
Antecedent source
unknown
Color
multicolored
Contents
Part 1 Cost estimating: estimate accuracy, estimation approaches/classes, estimating methods, computerized estimating, labour productivity, indirect costs, data collection and management, estimate coding and documentation, predicting future escalation, contingency a provision for uncertainties, estimating a revamp project. Part 2 Cost control: introduction to cost control, the cost engineer as part of project management, cost control during conceptual engineering, cost control during detailed engineering - introduction to the problem, cost control during engineering - engineering costs, cost control during detailed engineering - equipment purchases, cost control during detailed engineering - bulk materials, project changes, subcontract development, administration and control, cost control during construction - the first three steps, cost control during construction - forecasting direct field labour, cost control during construction - items other than direct field labour, the monthly cost report and cost control meetings, systems and computer applications, the cost of cost control, selecting a contractor for a reimbursable-type contract, control of bulk materials. Part 3 Case studies
Control code
on1103441058
Dimensions
unknown
Edition
Third edition
Extent
1 online resource (440 pages)
File format
unknown
Form of item
online
Isbn
9781439892886
Level of compression
unknown
Note
Taylor & Francis
Quality assurance targets
not applicable
Reformatting quality
unknown
Sound
unknown sound
Specific material designation
remote
System control number
(OCoLC)1103441058

Library Locations

    • InternetBorrow it
      Albany, Auckland, 0632, NZ
Processing Feedback ...